PPLA RENEWAL IN THAILAND

THAILAND
2024 06 23

In June 2024, Mainflo completed the renewal and upgrade of a PPLA (post-pelleting liquid application) system for an international feed group in Thailand.

The plant operates three pelleting lines, and the project was executed in two phases:

Phase 1: one line — dosing of two enzymes and oil

Phase 2: the remaining two lines

The upgraded system reuses the existing fat-coater hardware, while the control of both enzymes and oil is integrated into a single platform — one unified operator interface and one set of reports for the entire liquid application process.

Since commissioning, the system has been running with stable and accurate dosing, and the customer is highly satisfied with the performance.

微信图片_20260616132946_65_52.jpg 微信图片_20260616135250_83_52.jpg 

微信图片_20260616135244_77_52.jpg 微信图片_20260616133837_74_52.jpg

19# Building, 3918 Daye Road, Fengxian District, Shanghai, China
+86 (0) 21 5752 0880

COPYRIGHT © 2025 Mainflo.  All Rights Reserved  
icon.png沪公网安备31012002005914 沪ICP备15024533号-1     沪公网备案徽章.png沪公网备案31012002004497